Gate one includes inception,and this phase ensures that all stakeholders have a shared understanding of the proposed system and what it will do.

A) True
B) False

Correct Answer

verifed

verified

What is an internal department that oversees all organizational projects?


A) Project deliverables
B) Project scope
C) Project management office
D) Project milestones

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

What is the systems development life cycle?


A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system
C) Involves describing the desired features and operations of the system
D) The overall process for developing information systems from planning and analysis through implementation and maintenance

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Exception reports organize and categorize data for managerial perusal.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is a business-related consequence of failing software?


A) Decrease productivity
B) Damage to brand reputation
C) Increased liabilities
D) All of these choices

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Loose coupling is the capability of two or more computer systems to share data and resources,even though they are made by different manufacturers.

A) True
B) False

Correct Answer

verifed

verified

A kill switch is a trigger that enables a project manager to close the project before completion.

A) True
B) False

Correct Answer

verifed

verified

What is the design phase in the SDLC?


A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system
C) Involves describing the desired features and operations of the system
D) Involves placing the system into production so users can begin to perform actual business operations with the system

E) None of the above
F) B) and C)

Correct Answer

verifed

verified

Project constraints are factors considered to be true,real,or certain without proof or demonstration.

A) True
B) False

Correct Answer

verifed

verified

Gantt charts define dependency between project tasks before those tasks are scheduled.

A) True
B) False

Correct Answer

verifed

verified

Control objects for information and related technology (COBIT)is a set of best practices that helps an organization to maximize the benefits of an information system,while at the same time establishing appropriate controls to ensure minimum errors.

A) True
B) False

Correct Answer

verifed

verified

Software engineers use computer-aided software engineering (CASE),software tools that provide automated support for the development of the system.

A) True
B) False

Correct Answer

verifed

verified

What is project scope?


A) Quantifiable criteria that must be met for the project to be considered a success
B) Products,services,or processes that are not specifically a part of the project
C) Any measurable,tangible,verifiable outcome,result or item that is produced to complete a project or part of a project
D) Defines the work that must be completed to deliver a product with the specified features and functions

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Which of the following are tangible benefits?


A) Improved decision making
B) Improved community service
C) Improved goodwill
D) Increased quantity or sales

E) All of the above
F) A) and B)

Correct Answer

verifed

verified

Integration testing verifies that the units or pieces of code function correctly when integrated together.

A) True
B) False

Correct Answer

verifed

verified

The testing phase takes all the detailed design documents from the design phase and transforms them into the actual system.

A) True
B) False

Correct Answer

verifed

verified

What tests individual units or pieces of code for a system?


A) Unit testing
B) Development testing
C) Integration testing
D) User acceptance testing

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

Which gate includes building and developing the product?


A) Gate one
B) Gate two
C) Gate three
D) Gate four

E) C) and D)
F) All of the above

Correct Answer

verifed

verified

What are specific factors that can limit options including budget,delivery dates,available skilled resources,and organizational policies?


A) Project objectives
B) Project constraints
C) Project assumptions
D) Project deliverable

E) A) and B)
F) None of the above

Correct Answer

verifed

verified

What is a simple bar chart that depicts project tasks against a calendar?


A) Gantt chart
B) PERT chart
C) Dependency
D) All of these choices

E) All of the above
F) None of the above

Correct Answer

verifed

verified